Leads360 Support July 21, 2011
Prior to the 11.3 release, Lead360 has supported distribution of leads based on data contained within a lead. Introducing the concept of Performance Based Distribution will make it possible to dynamically increase or decrease lead maximums based on the following metrics:
The Performance Based Lead Max Adjustments will operate on the program level. Administrators may select one of the above referenced metrics from which to dynamically adjust daily lead maximums.
How it works
These thresholds are set on the program level and are applied to a single distribution programs. These thresholds are applied ONLY to automated lead distribution. Any manual assignment or batch assignment of leads will ignore this rule.
Configuring Performance Based Lead Max Adjustments
Configure these settings by clicking the Advanced Setting BETA: Performance Filters on the Add/Edit Lead Distribution page.


When this tab loads for the first time, i.e., when there have not yet been any Performance Filters applied, the tab will have only one field; Performance Metric. The field will default to the value “None,” meaning that
It is possible to choose from the following Performance Metrics:
After selecting a Performance Metric from the dropdown more fields will be displayed.

Available time frame dropdown options include:
Note that different configuration options are displayed based on whether the rules use time based or milestone (percentage based) rules.
When a time based performance metric (Speed to Contact Attempt or Speed to Contact) is selected in the performance metric dropdown; the additional Time Frame and Reward/Penalty elements are displayed. Here’s how they work.

Setting a reward/penalty for a time based metric is done by putting a number in the first field, selecting minutes, hours, or days from the dropdown. This sets the period of time. Then put a number of leads by which to increase or decrease the daily maximum. For example;
Reward: if {Speed to Contact Attempt} is LESS THAN 15 minutes then INCREASE Daily Lead Maximum by 2 leads.
When a percentage based performance metric (Contact Rate, Qualification Rate or Conversion Rate) is selected in the performance metric dropdown; the additional Time Frame and Reward/Penalty elements are displayed. Here’s how they work.

Setting a reward/penalty for a percentage based metric is done by putting a percentage in the first field, and putting a number of leads by which to increase or decrease the daily maximum. For example;
Reward: if {Conversion Rate} is GREATER THAN 15% then INCREASE Daily Lead Maximum by 2 leads.
After configuring the Performance Based Filters, Click the Save button to apply the performance filters.
It is possible to see the each user’s adjusted lead flow on the User Filters: Who receives leads? tab

There is a new Adjusted Daily Max Leads column on this tab.
If no change has been applied to user’s daily maximum, the Adjusted Daily Max Leads column will display the user’s normal daily max.
When an administrator clicks the text associated with the Reward or Penalty note, a popup is triggered. The popup contains a description of the relevant performance based filter.

On the Manage Users page, clicking the Distribution settings link on the Options column will display user distribution settings for the associated user

.
The Adjusted Daily Max Leads column also appears on this page. Its functionality, including the Daily Lead Max Adjustment Popup is the same as where this column appears on the User Filters: Who Receives Leads tab on the Add/Edit Distribution page.
